Progress-Curve Analysis: Extracting True Initial Rates
To construct a full progress curve and show how initial rates are correctly taken from its early linear region.
Theoretical Foundations
A progress curve ([P] vs time) starts linear (initial rate, v0) then bends as substrate depletes and product inhibits. Taking slopes too late underestimates v0 and corrupts Km/Vmax. Fitting the early linear portion (under ~10% conversion) gives valid Michaelis-Menten data.
Required Apparatus & Chemicals
Laboratory Apparatus
- Spectrophotometer
- Water bath
- Cuvettes
- Stopwatch
Chemical Reagents
- pNPP or ONPG substrate
- Alkaline phosphatase or beta-galactosidase
- Assay buffer
Step-by-Step Practical Procedure
- Start the reaction in a cuvette; record absorbance every 15 s for 10 min.
- Plot product concentration vs time (full progress curve).
- Fit the initial linear segment (first 1-2 min).
- Fit a later segment and compare slopes.
- Calculate the percent error from using the late slope.
- State the rule for valid initial rates.
Observations & Expected Results
Typical: curve linear for ~2 min then bends; the late slope is 20-40% lower than the true v0.
Worked Stoichiometric Calculations
Problem: Early slope 0.40 A/min, slope from 5-8 min 0.28 A/min. What is the error of the late slope?
Working: Underestimates v0 by (0.40-0.28)/0.40 x 100 = 30% (typical value).
Safety Precautions & Hazard Control
- Record from the moment of mixing.
- Convert absorbance to concentration via epsilon.
- Keep temperature constant.
Waste Disposal Protocol
Chromogen waste to hazardous organic collection.
Viva Voce Oral Defense Questions & Answers
Q: Why does the progress curve bend?
A: Substrate depletion, product inhibition, and possible enzyme inactivation.
Q: What is the 10% rule?
A: Measure rates before ~10% of substrate is consumed.
Q: How does this affect Km determination?
A: Underestimated v0 values distort Lineweaver-Burk slopes and intercepts.