Peroxidase Activity: Guaiacol Oxidation at 470 nm
To assay peroxidase activity from guaiacol oxidation kinetics at 470 nm.
Theoretical Foundations
Peroxidase catalyses H2O2 oxidation of guaiacol to tetraguaiacol, a brown product (λmax 470 nm, ε = 26.6 mM⁻¹ cm⁻¹). The initial rate dA/dt divided by ε gives enzyme activity in µmol min⁻¹ mL⁻¹ (units per mL).
Required Apparatus & Chemicals
Laboratory Apparatus
- UV-Vis spectrophotometer
- Cuvettes
- Micropipettes
- Stopwatch
- Buffer
Chemical Reagents
- Guaiacol (20 mM)
- H2O2 (10 mM)
- Phosphate buffer (pH 7.0)
- Peroxidase extract (e.g. turnip)
Step-by-Step Practical Procedure
- Mix buffer, guaiacol and H2O2 in a cuvette.
- Add enzyme extract; start timing immediately.
- Record A470 every 15 s for 3 min.
- Plot A versus t; take the initial slope.
- Convert to activity using ε = 26.6 mM⁻¹ cm⁻¹.
- Run a no-enzyme blank.
Observations & Expected Results
Brown colour grows linearly at first; typical ΔA/min ≈ 0.1-0.2 for dilute extracts.
Worked Stoichiometric Calculations
Problem: ΔA470/min = 0.120 (ε = 26.6 mM⁻¹ cm⁻¹, l = 1 cm, 0.1 mL enzyme in 3.0 mL). Find activity in µmol min⁻¹ mL⁻¹.
Working: Rate in cuvette = 0.120/26.6 = 4.51 × 10⁻³ mM min⁻¹ = 4.51 µM min⁻¹. In 3.0 mL: 4.51 × 3.0 = 13.5 nmol min⁻¹ from 0.1 mL enzyme → 135 nmol min⁻¹ mL⁻¹ = 0.135 µmol min⁻¹ mL⁻¹. (Using per-mL-of-reaction-mixture convention: 4.51 µmol L⁻¹ min⁻¹ × 0.003 L/0.0001 L = 0.135 U mL⁻¹.)
Safety Precautions & Hazard Control
- Start timing at enzyme addition.
- Use initial linear slope only.
- Keep H2O2 low; excess inactivates peroxidase.
- Prepare guaiacol fresh; it darkens in air.
Waste Disposal Protocol
Dilute guaiacol waste to the aqueous drain.
Viva Voce Oral Defense Questions & Answers
Q: What is one enzyme unit here?
A: The amount converting 1 µmol guaiacol per minute under the stated conditions.
Q: Why does excess H2O2 inactivate peroxidase?
A: It over-oxidises the heme centre to inactive forms (suicide inactivation).
Q: Why measure initial rates?
A: Substrate depletion and product inhibition later curve the progress plot.